
Wind Turbines for Hydrogen Station
- Five 10kW vertical axis wind turbines (vs. horizontal) due to proximity of runway.
- Supplement PV for 24/7 renewable energy.
- Installation underway; planned completion by November 2011.
- Wind analysis required to calculate energy and cost savings.
- When station is not operating, wind energy placed on grid.
